Developers

For developers and contractors

Your building's engineering systems, handled by one accountable team

MEP design, procurement, installation and handover: the full cycle, turnkey. We work alongside your general contractor, on your schedule.

What we offer

The full engineering cycle: turnkey MEP

One team, one point of responsibility, from design to handover.

01

Design

Our in-house design team produces the full MEP design: mechanical, electrical, water supply and drainage.

02

Procurement

Quality materials and equipment selected to the design.

03

Installation

Systems installed to the design and the agreed scope of work.

04

Commissioning and handover

Commissioning and turnkey handover of all systems.

Why VALE XXI

From design review to delivery

Engineering review

We check the design and propose justified changes before construction starts.

One team, full cycle

Design, materials, installation and handover in one place. One contact, one answer.

On your schedule

We work alongside the general contractor with our own crew on site.

Midea engineering partner

VRF, multi-split and heat pumps, sized to the building's real requirements.

Services

What we do

MEP systems

Climate, heating, ventilation, electrical, water supply, drainage and storm water.

Roofing and waterproofing

Turnkey roof design and construction: falls, insulation, membrane and roof drains.

Special systems

GeoAqua wastewater treatment plants from 50 m³/day (KANN equipment). Solar collectors for hot water.

Projects

From a private house to a high-rise complex

Midea VRF outdoor units on the roof, Megobroba project
2026 · Avchala · final stage

Megobroba

5-storey administrative building. Heating and air conditioning designed and installed: 4 Midea VRF systems and 55 ducted indoor units.

Tetri Kvadrati · BK Construction

Jikia, Gamrekeli, Kalaubani

19, 8 and 10 storeys. All internal systems, including storm water.

Residential complex · 17 storeys

Well House

Heating, water, drainage and ventilation, about 20,000 m². Roof 1,600 m².

Mziuri Development · wellness resort

GeoAqua treatment plants

KANN equipment, from design to start-up.

ONE DEVELOPMENT · 2026 · Didi Dighomi

Head office

Midea multi-split with cassette units, heating with an Ariston boiler.

Who we work with

Tetri KvadratiBK ConstructionMegobrobaMziuri DevelopmentElement ConstructionONE DEVELOPMENTWell HouseMidea

Most of our clients recommend VALE XXI to their friends and partners.

Frequently asked questions

What does turnkey work include?

Design of building engineering systems (MEP): heating, ventilation and air conditioning, water supply and sewerage. Then procurement, installation, commissioning and handover.

At what stage should VALE XXI be involved?

At the design stage, so engineering decisions are coordinated with the architecture before construction starts. We also join projects under construction and existing buildings.

What kind of buildings do you work on?

Residential buildings up to 19 floors, offices, hotels, industrial sites and private houses. Our office is in Tbilisi, Saburtalo.

Which equipment do you use?

Midea climate systems: VALE XXI is Midea's engineering partner. GeoAqua wastewater treatment plants on KANN equipment, with capacity from 50 m³ per day.

What should I send for a first assessment?

The building type and location, the project stage, a plan or design if you have one, and your questions.

Next step

Let's discuss your project

For a first conversation, send us:

  • building type and location
  • project stage
  • floor plan or design, if you have one
  • your engineering questions
Engineering consultation · projects+995 598 42 30 22

WhatsApp

Purchase, delivery and prices+995 511 53 99 88

WhatsApp · [email protected]

Office92 Besarion Zhgenti St, Saburtalo

Nutsubidze II plateau · 10:00–19:00, 7 days


Stay with us: engineering tips every dayFacebookInstagramYouTubeTikTok
☎Menu ☰